Striking wood beams show the building's construction type.
Striking wood beams show the building's construction type.
The open and inviting building was very well received.
The open and inviting building was very well received.
The basic structure of the construction consists of wood stands made of EGGER timber.
The basic structure of the construction consists of wood stands made of EGGER timber.
The timber frame construction is insulated. A vapour barrier film regulates room humidity.
The timber frame construction is insulated. A vapour barrier film regulates room humidity.
EGGER planed spruce timber transverse beams feature in the façade construction.
EGGER planed spruce timber transverse beams feature in the façade construction.
EGGER laminate flooring creates an inviting atmosphere.
EGGER laminate flooring creates an inviting atmosphere.
The wooden construction frames the representative entrance area.
The wooden construction frames the representative entrance area.
The visitor follows the exhibition on a circular path.
The visitor follows the exhibition on a circular path.
The EGGER product range is showcased inside the building.
The EGGER product range is showcased inside the building.
The open and inviting building was well received during the official opening in August 2015.
The open and inviting building was well received during the official opening in August 2015.

One of the first commercial buildings with timber frame construction in the country's history.
The twelve metre high, straight-lined building with its wood-clad façades exudes a culture of wood construction from every pore. It was designed by the architect, Lamia Yammine Douaihy. The three-level building contains offices, workshops, an EGGER showroom, and a kitchen exhibition - all designed with EGGER Laminate Flooring (H1022 and H2790). The vertical timber frame construction consists of beams, reinforced with EGGER OSB 3. The tongue and groove design of the OSB boards significantly sped up the assembly. The construction is very durable. This is particularly important, considering the increased seismic risk in the area.

Implemented by:

Architect:

Lamia Yammine Douaihy, Douaihy Pour Le Bois SARL, Zouk Mosbeh (LB)

Interior architect:

Michael Schwebius, Prien am Chiemsee (DE),
www.schwebius.de

Construction and processing:

Douaihy Pour Le Bois SARL, Zouk Mikael (LB),
www.douaihypourlebois.com

Construction period:

September 2014 to March 2015