Sports hall with a difference - visible OSB on the ceiling and wall
A triple-section sports hall was built on behalf of the Swiss municipality of Schötz and opened in August, 2015. The sports hall is 47 m long, 28 m wide, 9 metres high and was built in modular wooden construction. The adjoining two-storey building for changing clothes, including a spectators gallery, is built in a solid construction. The EGGER OSB 3 board is perfectly suitable to be displayed visually. In this sports hall, it has been installed in the ceiling and in the wall, so as to be visible. Its bright glaze creates a pleasant atmosphere.
Implemented by:
Fabricator:
Renggli AG, Sursee
www.renggli-haus.ch
Architect:
Hertig Noetzli Architekten, Aarau
www.hna.ch
Construction period:
June 2014 until the opening in August 2015