The finished innovation and application centre in Detmold.
The finished innovation and application centre in Detmold.
The formaldehyde-free EGGER OSB 4 TOP boards were used for the roof and walls.
The formaldehyde-free EGGER OSB 4 TOP boards were used for the roof and walls.
The new building of the Jowat corporate group is assembled using wood construction processes.
The new building of the Jowat corporate group is assembled using wood construction processes.
EGGER OSB 4 TOP boards were joined for the roof structure.
EGGER OSB 4 TOP boards were joined for the roof structure.
EGGER OSB 4 TOP is used for the innovation and application centre.
EGGER OSB 4 TOP is used for the innovation and application centre.
The multifunctional innovation and application centre is highly representative for Jowat.
The multifunctional innovation and application centre is highly representative for Jowat.
Approximately 1,300 m2 of EGGER OSB 4 TOP were installed.
Approximately 1,300 m2 of EGGER OSB 4 TOP were installed.

The new innovation and application centre of the Detmold-based glue specialist glues approximately 1,300 m 2 of EGGER OSB 4 TOP.
60 years after building the first production hall, Jowat SE continues to invest in the future of gluing at their Detmold site: the new and future-oriented innovation and application centre aims to act as a meeting point and to make gluing technology a reality for customers and partners. In a total area of 2500 m 2 , the multi-functional Haus der Technik offers an exhibition, laboratory and training rooms as well as the latest industrial systems for tests and demonstrations. Given how important the wood and furniture industry is for the Jowat corporate group, the new building has been assembled using wood construction processes. On the exterior, there are battens that connect the floorboard to the roof structure which is symbolic of strands of glue. The formaldehyde-free glued EGGER OSB 4 TOP boards were used to build the roof and walls, as they have the right static and construction characteristics to act as a basis for Jowat adhesives.

Executed by:

Builder / Customer:

Jowat SE, Detmold (DE)
www.jowat.com

Fabricator:

ZÜBLIN Timber Aichach GmbH, Aichach (DE)
www.zueblin-timber.com

Architect:

IFuH Institut für urbanen Holzbau, Berlin (DE)
www.ifuh.org

Construction period:

July 2017 – September 2018

Illustration credits:

© Raphael Sprenger