Executed by:
Customer/Builder:
University Hospital Schleswig-Holstein (DE)
www.uksh.de
Architect:
SCHMIEDER.DAU.ARCHITEKTEN. GMBH (DE)
www.schmiederdau.de
Fabricator:
Tischlerei SCHESCHY GmbH (AT)
www.scheschy.at
Distributor:
Weyland, Schärding (AT)
www.weyland.at
J. u. A. Frischeis Linz (AT)
www.frischeis.at
Construction period:
opening Kiel on 16.08.2019, opening Lübeck on 08.11.2019
Size of the project:
The UKSH building in Kiel has 64,000 m2 of usable space. Construction is underway on a similar scale at the Lübeck campus.