Rehabilitation centre Kitzbühel

Optical support for quick recovery

Get fit and healthy in the heart of the Tirol Alps.
Das The Kitzbühel rehabilitation centre for orthopaedics, accident surgery and neurosurgery offers space for 120 patients. The well-being of the guests during the three-week rehabilitation therapy plays a decisive role in recovery. That is why the centre was designed with modern, bright rooms equipped with natural materials.

ZGP architects developed a concept that supports the patients’ effect of well-being, allows the efficient therapy operation and ensures a pleasant work climate. EGGER materials were used in the rooms, the cafeteria, the dining room, the office and administrative rooms.

Implemented by:

Customer / builder:

VAMED VSG Standortentwicklung und Engineering GmbH & Co. KG, Wien (AT), www.vamed.com

Architect:

Zellinger, Gundhold + Partner ZT GmbH, Linz (AT), www.zgp.at

Rosenfelder + Höfler (Bauphysiker), Graz (AT), www.diebauphysiker.at

GZ-Engineering, Linz (AT),
www.gz-engineering.at

VAMED – Frau Faroknia (Farbkonzept), Wien (AT), www.vamed.com

Fabricator:

Scheschy GmbH, Neufelden (AT), www.scheschy.at

Wetscher GmbH, Fügen (AT), www.wetscher.com

R&R Objekttischlerei GmbH, Leonding bei Linz (AT),
www.rr-tueren.at

Construction period

September 2013